Waste-to-energy Power Plant, Infraserv Höchst Frankfurt, Germany


Installation, testing and commissioning of Boiler related areas for all 3 lines based on ABB 800x and AC800M

Customer: INP, Römerberg Germany

End User: Industriepark Infraserv Höchst

Qatar Steel

 Upgrade/Modification of Hardware & Software of CCM#3 based on PROFACE

Customer: Qatar Steel

End User: Qatar Steel

Job Completion Certificate

Supply of Proface Parts

o AGP/AST series
o GP/ST series
o GLC/LT series
o PL/PS/FP/PSG series
Customers:
o ALBA, Aluminium of Baharain, Bahrain
o Mazin Computer Centre, Bahrain
o Barikansson Contracting Est, Saudi Arabia
o Corrpro Arabia Cathodic Protection Company, Saudi Arabia
o Bahra Advanced Cable Manufacture Co. Ltd, Saudi Arabia
o Obeikan Paper Industry, Saudi Arabia
o CTS Middle East LLC, Sharjah, UAE

Installation Support, Saudi Arabia

Installation, testing and commissioning of Centralized Alarm collector from GOSP DCS & ESD Systems (Yokogawa, Triconex & ICS Triplex)

Customer: Matrikon Middle East, W.L.L, Bahrain

End User: ARAMCO, Gas Oil Separation Plants, Saudi Arabia

F & G Protection System, Saudi Arabia

Modification and upgrade of existing Fire & Gas System installed within TASNEE Petrochemicals.

Customer: Integna, Bahrain

End User: TASNEE, Saudi Arabia

Karan Project, Saudi Arabia

Provided technical support services (SINAUT ST7 SCADA) for Karan Project.

Customer: Siemens Ltd, Saudi Arabia

End User: Saudi Aramco

Shuqaiq WTS Project, Saudi Arabia

Provided engineering services to IICS for engineering and documentation of the project.

Customer: IICS

End User: SWCC

Ibn-Zahr/Sabic PCS7/FS Extruder Upgade, Saudi Arabia

Design, Engineering, Software development and Performing Acceptance tests at factory as per Ibn-Zahr / Sabic specifications & design requirements for working, reliable & approved control system for the entire project.

Customer: IICS

End User: Sabic

Automated Power Transfer for Chemical Plant:

To assure continuous power for chemical production, Zerotech devised an Automatic Transfer Scheme to switch to an alternate power feed in the event of failure. Zerotech performed a complete scheme check, as well as testing and commissioning of the 35.4. Gas-Insulated switchgear involved. No manual switching required -- system restoration is automatic.

Customer: Siemens Ltd, Saudi Arabia

End User: Chemanol Jubail, Saudi Arabia

Upgraded Power Control HMI at Cement Plant:

To revamp the plant's visualization capabilities, Zerotech engineered and commissioned an upgrade from their legacy COROS LS-B to WinCC v6.2. Both HMIs ran concurrently to avoid any shutdown in production. The open system now allows easier expansion as needed.

Customer: Siemens Ltd, Saudi Arabia

End User: Saudi Cement Company, Hofuf Plant, Saudi Arabia

More precise SCADA for Oil/Gas Pipeline:

Zerotech provided consulting engineering and support for upgrading the SCADA for the 1500 km East-West Pipeline in Saudi Arabia. Involves 12 pump stations and one master SCADA station. Standardized routines and automation of engineering processes enabled Zerotech to meet unusually tight schedules without compromising quality.

Customer: Arabia Electric Ltd, Saudi Arabia

End User: Saudi Aramco, Saudi Arabia

System Controls for New Power Boiler: Paper Plant

For a new steam power boiler, Zerotech engineers devised the system controls using a Siemens PCS7 Control system along with SIPAPAER library. Zerotech was able to dramatically reduce engineering time through the use of typicals and IEA, allowing the customer to commission the boiler in record time.

Customer: Nicklas & Partners, Germany

End User: MD Albbruck

Fault-tolerant Visualization System for Cement Plant

When the client wanted to upgrade their HMI to a new WinCC system, Zerotech provided engineering for migrating 11 PLCs controlling the power plant, using the existing network. Redundancy provided the fault-tolerance required. Zerotech also fully trained all plant personnel on the new WinCC software.

Customer: Siemens Ltd, Saudi Arabia

End User: Yanbu Cement, Saudi Arabia

Two-Grade Gasoline Upgrade

To upgrade an old Terminal Management System to a new CS7 SCADA system, Zerotech provided engineering and commissioning of eleven facilities with a in record cutover time of 6 to 8 hours.

Customer: Siemens Ltd, Saudi Arabia

End User: Saudi Aramco, Saudi Arabia

 